I am building out a 210 that has two corner overflows and was going to drain one
into one sump 70G and then the other drain would go into a second sump a150G
rubber-maid tub. I was going to plumb them with 2" bulk head for the rubber maid
going into a 2" t then I was going to leverage 2 1" bulk heads T'ed and joining
the main T back to the return pump that would go to a manifold and return as
well. I would naturally have disconnects and Ball valves to ensure that I could
cut off either sump when ever I needed to.
Does any one see any problem
with this? Has any one done something like this before.
I was wondering
if any one had words of wisdom. on this design.
Thanks


LinkBack URL
About LinkBacks

Reply With Quote






Bookmarks