Looking to drill and plumb my first tank. So far, glue everything! Only need true unions after overflow box for maintenance, correct?
But my question is this,
If I have to glue my standpipes to the overflow box bulkheads, how do I set up the water height and pipe heights?
I plan on using downward u-shape for primary and secondary pipes also. This is okay as long as secondary has a small hole drilled in top, correct?
But my question is this,
If I have to glue my standpipes to the overflow box bulkheads, how do I set up the water height and pipe heights?
I plan on using downward u-shape for primary and secondary pipes also. This is okay as long as secondary has a small hole drilled in top, correct?
Last edited: