I was just thinking, yea, again I am thinking, lol, and it usually cost me money. ;Facepalm Watching how long it takes my 150 gal per day BRS RO/DI unit to fill the containers on my mixing station is kinda like watching paint dry. I have 90 plus pounds of water pressure, yea a lot, but it gives me the possibility to do something that will increase the output of RO/DI water. I may just go ahead and order 2 100 gal per day membranes and change the 75 gal per day ones. All I would have to do is change the flow restrictor in the unit from 550 to 800 to get more water production. Its not a emergency, just something to think about.
Last edited: