COR20 Fallback Program

Users Who Are Viewing This Thread (Total: 1, Members: 0, Guests: 1)

rob safron

Well-Known Member
View Badges
Joined
Feb 28, 2017
Messages
607
Reaction score
378
Rating - 0%
0   0   0
I have my COR20 power plugged into a UPS. In the advanced tab for the COR I have tried to write “Fallback 70” wanting the Cor to run at 70% speed if apex loses power. That code will not take. Any ideas what I’m not doing correctly?
 

leepink23

2500 Club Member
View Badges
Joined
Nov 22, 2016
Messages
2,749
Reaction score
2,206
Location
Mississippi
Rating - 0%
0   0   0
I created a virtual outlet and called it power out, I programmed it to come on if apex power was off, then in advanced tab for my varios I have it if power out on then 25. I would think that would work for the Cor.

353ED67C-0BEF-4478-BC60-CD2D2177F76E.png


BA4DFDD4-D433-4052-A9B8-B81AA16A7070.png
 

High pressure shells: Do you look for signs of stress in the invertebrates in your reef tank?

  • I regularly look for signs of invertebrate stress in my reef tank.

    Votes: 39 32.5%
  • I occasionally look for signs of invertebrate stress in my reef tank.

    Votes: 28 23.3%
  • I rarely look for signs of invertebrate stress in my reef tank.

    Votes: 23 19.2%
  • I never look for signs of invertebrate stress in my reef tank.

    Votes: 30 25.0%
  • Other.

    Votes: 0 0.0%
Back
Top