- Joined
- Jan 22, 2020
- Messages
- 956
- Reaction score
- 1,018
I just finished my first rough plumbing attempt for my Reefer xl 425 v3 sump. Looking for feedback in ways to improve my plan. Any and all constructive feedback is appreciated.
A few notes from what is shown:
-The manifold will be elevated to top of the cabinet and leave about 3-4 inches above
-The Clarisea and Vectra pump will be connected from the last orange elbow down via silicone tubing to reduce vibration transfer
-2 media reactors will be plumbed with ball valves to the right of the manifold between the skimmer and Clarisea in the picture
-3rd manifold port is for future flexibility with no current plans
-Emergency drain empties into chamber with Clarisea, but not plumbed to Clarisea
-2 media reactors plan to drain into chamber with the return pump
A few notes from what is shown:
-The manifold will be elevated to top of the cabinet and leave about 3-4 inches above
-The Clarisea and Vectra pump will be connected from the last orange elbow down via silicone tubing to reduce vibration transfer
-2 media reactors will be plumbed with ball valves to the right of the manifold between the skimmer and Clarisea in the picture
-3rd manifold port is for future flexibility with no current plans
-Emergency drain empties into chamber with Clarisea, but not plumbed to Clarisea
-2 media reactors plan to drain into chamber with the return pump