- Joined
- Feb 12, 2019
- Messages
- 26
- Reaction score
- 16
I am about 70% done with the stand. It will have 11 2x6 verticle supports (2 in each corner and 3 in the back. I still need to finish all the rest of the load bearing vertical supports Im still deciding on the sump but i plan on leaving 3ft of space in the front. I will most likely put 2 2x4s in the spots where the blue tape is. This gives me plenty of space in the middle for the sump and i can then have 2 big doors in the middle and 2 skinny ones on the sides of those. I will top it off with 3/4 plywood on top. I will also add a bunch of 2x4s on the bottom and cover with plywood where the sump will sit. Just wanted to show the progress so far