I know I haven't been going into depth or detail really about what I'm doing. I find that a header and visuals are how it makes sense to me. Any questions or criticisms about what I'm doing, hit me with them.
This is my first time doing most of it on my own tank from design to proof of concept to build.
Two of the three returns connected from the return pump.
Remaining return is fed by the UV outflow which is yet to be plumbed in.
The stand is sitting 3.25" off of the wall.
Centered the tank on the wall, empty leveled it, then pumped about 8" of water into it. Hip bumped it a few times on the corners letting the joints settle.
I then corrected the level again under load and siphoned the water right back out with the same hose.
Drains plumbed
Through the wall
Fish spam
This is my first time doing most of it on my own tank from design to proof of concept to build.
Two of the three returns connected from the return pump.
Remaining return is fed by the UV outflow which is yet to be plumbed in.
The stand is sitting 3.25" off of the wall.
Centered the tank on the wall, empty leveled it, then pumped about 8" of water into it. Hip bumped it a few times on the corners letting the joints settle.
I then corrected the level again under load and siphoned the water right back out with the same hose.
Drains plumbed
Through the wall
Fish spam