Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
nice! at 1st i could not see the over flow box and was wondering if you removed it. then I looked closer and saw it. ;p
wow, great story, the Reno looks incredible. I’m on my fourth (and hopefully final reno) myself. I too vaulted the ceiling, but only in my bedroom, came out really sweet.
I’d be interested to see your final plumbing, especially the manifold. I’m looking to run the manifold from it’s own pump to, I reckon it’ll male tuning the return a lot simpler. Its midnight here and l gotta crash as lm up for work in a few hours but I’ll definitely be following your buile
Thanks bud.Looking good!
RODI Station now built and the water is filling the tank….. I’ve added a few solenoids that’ll control using a simple PLC program and a minimum/maximum level switch that I’ll mount in my ATO allowing me to automate the refilling of the top up. I’ve added a pre-flush solenoid too to run the initial high TDS out. Don’t worry, l’ve got a few leak detectors and fail safes built in, hopefully there’s enough….
Rough schematic for the RODI ATO set up.RODI Station now built and the water is filling the tank….. I’ve added a few solenoids that’ll control using a simple PLC program and a minimum/maximum level switch that I’ll mount in my ATO allowing me to automate the refilling of the top up. I’ve added a pre-flush solenoid too to run the initial high TDS out. Don’t worry, l’ve got a few leak detectors and fail safes built in, hopefully there’s enough….