For me this philosophy can be applied to just about every aspect of a new build, plan plan plan plan and when you think you have planned enough, plan some more. I agree 100% and then the first thing to remember is, even after all that planning, something is still bound to come up. It's just the nature of the beast. I certainly didn't expect some of my 90° fittings to shrink when I added cleaner in them making them total garbage, however I did plan ahead and bought extras incase SOMETHING happened.
And currently, not waiting on anything now, some of the parts I needed showed up and the others I'm holding off on ordering until I know for sure what I need. However, this will be running tomorrow. As a herbie drain setup for now and when the rest of the parts come in I'll get my emergency drain online and we will be firing on all cylinders ;Smuggrin
I thought you said that you didn't give in to peer pressure that easily. You do realize that you just promised water running through your sump tomorrow right? I am sure if you miss that target we will all be very understanding. ;Facepalm ;Hilarious ;Hilarious
Nothing wrong with a Herbie setup. Can't wait to see it running.