I have a S2 which was originally meant to push water through the UV filter above then cycle back in with the rest of the water with the main return pump (M2). My original plumbing was better but before I put fish in it, I opted to get a bigger tank from 3 feet to 4 feet. The guy plumbing the tank had to change the original layout we had and he did it all one night (up to 3am) even though he had the tank for 4 weeks. I didn't check the plumbing underneath when he delivered as I thought he just would use the same setup as before, but he changed it.
Question - Will the S2 pump be able to push the water through the UV filter without impedance from the M2? It looks like the M2 is going to push water up then it reaches the T junction. Water fill flow back through the UV filter pushing against the S2 weaker flow rate and no UV filtering will be done....? Is this plumbing job messed up and what can I do to fix it?
I don't know what to do here... help please.
-First pic is the right side of sump. Orange is Emergency Overflow back into the return pump. (Originally we had it in the first section with overflow)
- Left side of Sump
- Top Down
- Back of Aquarium
Question - Will the S2 pump be able to push the water through the UV filter without impedance from the M2? It looks like the M2 is going to push water up then it reaches the T junction. Water fill flow back through the UV filter pushing against the S2 weaker flow rate and no UV filtering will be done....? Is this plumbing job messed up and what can I do to fix it?
I don't know what to do here... help please.
-First pic is the right side of sump. Orange is Emergency Overflow back into the return pump. (Originally we had it in the first section with overflow)
- Left side of Sump
- Top Down
- Back of Aquarium