- Joined
- Feb 16, 2016
- Messages
- 481
- Reaction score
- 142
Hello
I am upgrading to a Red Sea 525 from my Red Sea 350. I am planning to hard plumb the system and also switching the main stock drain valve to a gate valve. I purchased this system used for a great price but the stock valve has ceased up for some reason so it needs to be replaced regardless and I was told a gate valve was a better way to go instead of the stock drain valve. Now here is my dilemma with this project. I have zero DIY skills and even though I've seen different set ups and ideas online I have no idea how to go about it. So the purpose for this post is to see if theres anyone out there that has hard plumbed a reefer 525 and can share how they did it and guide me as to what size plumbing ill be needing, what type of fittings,valves and where to purchase everything. I would to have the ability to add two AquaMaxx reactors and have a 3rd option to add an algae scrubber in the long run.
thanks in advance.
I am upgrading to a Red Sea 525 from my Red Sea 350. I am planning to hard plumb the system and also switching the main stock drain valve to a gate valve. I purchased this system used for a great price but the stock valve has ceased up for some reason so it needs to be replaced regardless and I was told a gate valve was a better way to go instead of the stock drain valve. Now here is my dilemma with this project. I have zero DIY skills and even though I've seen different set ups and ideas online I have no idea how to go about it. So the purpose for this post is to see if theres anyone out there that has hard plumbed a reefer 525 and can share how they did it and guide me as to what size plumbing ill be needing, what type of fittings,valves and where to purchase everything. I would to have the ability to add two AquaMaxx reactors and have a 3rd option to add an algae scrubber in the long run.
thanks in advance.