Hi all,
I'm having major issues putting in the plumbing in my Red Sea Reefer 625 G2.
The pipes that go into the overflow box have 2 threads and 2 rubber rings at the bottom.
The first thread goes in fine but the second thread won't 'bite'. The rubber rings make it impossible to turn the pipe down further because they are too tight. Tools should not be used and I've actually busted my hand trying to screw things things into place.
Red Sea seems to be a major brand so I can't imaging there is something wrong with my system.
It must be me doing something wrong.
Any suggestions?
I'm having major issues putting in the plumbing in my Red Sea Reefer 625 G2.
The pipes that go into the overflow box have 2 threads and 2 rubber rings at the bottom.
The first thread goes in fine but the second thread won't 'bite'. The rubber rings make it impossible to turn the pipe down further because they are too tight. Tools should not be used and I've actually busted my hand trying to screw things things into place.
Red Sea seems to be a major brand so I can't imaging there is something wrong with my system.
It must be me doing something wrong.
Any suggestions?
Last edited: