Got this dosing line holder from 3D Printed. My sump only has two dosing line holders. I have to take off the outside bulkhead holders to get to the thumb screws when mounting or unmounting.
Since there will be two output pipes for return pumps, an ATK bracket, and maybe a magnetic probe holder, to get to the dosing bracket thumb screws my arm has to go above the two baffles between the skimmer section and return section of the sump. Then to have the room for my arm I’ll have to remove the skimmate collector and skimmer.
All that to get the dosing holder bracket off so I can get to the ATK bracket or service the return section of the sump for anything else.
Since there will be two output pipes for return pumps, an ATK bracket, and maybe a magnetic probe holder, to get to the dosing bracket thumb screws my arm has to go above the two baffles between the skimmer section and return section of the sump. Then to have the room for my arm I’ll have to remove the skimmate collector and skimmer.
All that to get the dosing holder bracket off so I can get to the ATK bracket or service the return section of the sump for anything else.