I am building a sump room finally. There is a cinder block wall in between where the tank will be in my finished basement section and where the sump room will be. i plan on making a hole in the wall and feed the drain and supply lines through it.
my questions is would i be able to join the drain lines and drain into one larger sock? they will still have valves before the join so i can shut either drain if i have too. Should i increase the diameter of the drain pipe? or should i keep 2 separate drain lines?
Thanks in advance for any input.
my questions is would i be able to join the drain lines and drain into one larger sock? they will still have valves before the join so i can shut either drain if i have too. Should i increase the diameter of the drain pipe? or should i keep 2 separate drain lines?