Sold my house and had to sell the 125. So many newer homes in my area don't have an empty 6ft wall where stuff doesn't have to go.
This "build" aka downsize happened in the span of about 3-4 days.
Sunday: Dropped the tank off at my LFS to get it drilled. I was able to trade some stuff for a glass holes overflow.
Monday: Picked the tank up and did a dry fit of the plumbing. Coordinated with the buyers of my 125 so the swap would have been done in a day.
This "build" aka downsize happened in the span of about 3-4 days.
Sunday: Dropped the tank off at my LFS to get it drilled. I was able to trade some stuff for a glass holes overflow.
Monday: Picked the tank up and did a dry fit of the plumbing. Coordinated with the buyers of my 125 so the swap would have been done in a day.