Finally got finished up.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Looks good!!!!
Finally got finished up.
That looks nice. I was supposed to start mine this week, but still haven't.
Thanks Cameron I appreciate the look.Looks good!!!!
Agreed. Krylon Fusion. Lots of colors to choose from and you can use the regular fittings from your local hardware store. Some of the plumbing I have done with it in my sump area (in black). Requires a little planning, pre-assembly, disassembly and some masking, but I like the continuous run of color. I even painted one of the gate valves and could have painted the unions as well. The plumbing has been is use now for more than two years and portions of it submerged in salt water.I bought spray paint that bonded to the PVC plumbing and safe for the tank. Got all the color you want and a lot cheaper.
Looks great! DC pumps all the way. Like that vectra.Here is my plumbing job did it my self and probably lost a lot of head pressure the way it did it but the pump I have is more than enough for my set up.
No complaints so far. Any one that needs a new pump would recommend 100%Looks great! DC pumps all the way. Like that vectra.
No doubt here nothing but good things. I went with the RODC 5500. Vectra had not come out yet.No complaints so far. Any one that needs a new pump would recommend 100%
Holly.cow those are some serious plumbing there.
Finally got finished up.
Looks good!!!Well here is what I have so far.
I did 3/4 from pump to manifold 3/4 from manifold to the tank and refugium then 1/2 from 2 shut offs from manifold to the two reactors I have. Just my set up you. You would think you should be fine reducing to 1/2 inch though.Thanks. I just need to figure out the return plumbing now. Was thinking of coming to a manifold with 1 1/2" then reducing down to 2 3/4" for return.