I have an Inkbird controller with dual 600 watt BRS titanium heaters. When I plugged the Inkbird in to one of the outlets on the EB832 I get a high load warning and have had to move the plug to a seperate non-contolled outlet. I would very much like to run this through the Apex for a redundancy.
System is 230 gallons.
For those using this type of setup, how are you doing it?
Is dual 600 watt heaters overkill? Is there a better set up?
System is 230 gallons.
For those using this type of setup, how are you doing it?
Is dual 600 watt heaters overkill? Is there a better set up?