I picked up the stand today - it’s heavy duty. Way over built for the tank, but that’s how I like it. I cut some 7/8” holes under each leg for the 5/8” thread adjustable feet posts to run through and then welded the nut over the hole. My welding skills are pretty rusty (pun here, get it?) but they are bombproof. They won’t be very visible but I grinded the welds down a bit so it will be less noticeable. I ran out of Argon with 3 more to weld so I’ll be a little late dropping this off to get powder coated on Monday.