- Joined
- Jan 24, 2016
- Messages
- 775
- Reaction score
- 839
Started working on this over the past week or 2.
Finally got the blade sitting right and staying on. Have it connected to a power drill for testing. But it looks like its time to order a small motor and getting the final assembly done.
Finally got the blade sitting right and staying on. Have it connected to a power drill for testing. But it looks like its time to order a small motor and getting the final assembly done.
