- Joined
- Jul 20, 2013
- Messages
- 335
- Reaction score
- 183
For the past two months I have had my MP40s connected to my energy and controlling them using the knob on the front. I purchased the WXM today and followed the instructions to setup two of the pumps. Should I have deleted my old tiles and configurations first? I now have two sets of tiles for the pumps. Will these conflict with each other?