I just aquired a new APEX system and have modified my cabinet to house the controller, EB32, INKBIRD controller and mightyjet pump controller. I will be adding a few modules like FMM down the road.
My plan is to run all 120v wiring on the right side and keeping it up high in the cabinet and low voltage/DC wiring low and to the left.
This cabinet is for a IM NUVO AIO so not alot of spare space down here.
How far should wires be seperated to reduce interference on the low voltage signals?
Where wires will eventually run in unison should they just cross perpendicular as in most controls applications or is there a better plan for that?
Not to sure how well the signal wiring is shielded or how susceptible it is to 120v pulsing.
My plan is to run all 120v wiring on the right side and keeping it up high in the cabinet and low voltage/DC wiring low and to the left.
This cabinet is for a IM NUVO AIO so not alot of spare space down here.
How far should wires be seperated to reduce interference on the low voltage signals?
Where wires will eventually run in unison should they just cross perpendicular as in most controls applications or is there a better plan for that?
Not to sure how well the signal wiring is shielded or how susceptible it is to 120v pulsing.