I need to send one of my Stream3’s out to FOH to get guards 3d printed. I have MP60s and 40s that I could sub in while one of the streams is out of service. Due to my plumbing, I am only able to get it in one place (first I’m going to have to put the dry side in a a series of vacuum sealed bags) where my floating weir is. What’s the downside to put it above the purple pipe where the floating weir starts?


