- Joined
- May 31, 2020
- Messages
- 20
- Reaction score
- 4
Piping continues through the floor/ceiling down to the basement. The drain line is 1" and return is 3/4".
Cont.:
As of 1 Jun '20:
As of 21 Jul '20:
Equipments: Two-part dose (DOS) + Magnesium (BRS). 32 Gallon Brute for RO/DI. A pair of Tom water pumps connected to JBJ ATO. Reef Octopus INT-150 Classic. 1/10 HP JBJ Arctica chiller.