I've decided to tidy up my wiring for all my sump gear a little bit.
I'm calling this the first phase (excuse the pun ;) ;) )
so now i just need to build the assembly and get everything converted over, ill be double checking the total amp output for each circuit just to make sure i won't have an overload due to excess draw from any equipment. the lighting I'm going to keep on it's own circuit.
I'm calling this the first phase (excuse the pun ;) ;) )
so now i just need to build the assembly and get everything converted over, ill be double checking the total amp output for each circuit just to make sure i won't have an overload due to excess draw from any equipment. the lighting I'm going to keep on it's own circuit.