Hi
I designed my sump for specific equipment, which have been replaced, so the chambers are no longer able to fit the equipment I'd like to add.
Since I cannot move the sump, moving the baffles will not be an easy task.
So, I came up with this (crazy?) solution.
I hope my sketch makes sense, if not please just ask.
Top is current setup, bottom what I was thinking might work:
Does it make sense, and anything that could mean problems in the long run?
I designed my sump for specific equipment, which have been replaced, so the chambers are no longer able to fit the equipment I'd like to add.
Since I cannot move the sump, moving the baffles will not be an easy task.
So, I came up with this (crazy?) solution.
I hope my sketch makes sense, if not please just ask.
Top is current setup, bottom what I was thinking might work:
Does it make sense, and anything that could mean problems in the long run?