Hello!
I'm drilling a 125 gallon tank and have planned qty1 1in hole for the return. This 1in return will match the cor-20 return.
So, I have read about putting a second pump in as an redundant return. But, im concerned that pre-drilling the return may leak, since im using bulk head and a plug.
Thoughts?
I'm drilling a 125 gallon tank and have planned qty1 1in hole for the return. This 1in return will match the cor-20 return.
So, I have read about putting a second pump in as an redundant return. But, im concerned that pre-drilling the return may leak, since im using bulk head and a plug.
Thoughts?