Tomorrow I will be doing the following:
-finishing second coat of polyurethane
-replacing hardware once everything is dry
-attaching reflector and lights to inside of canopy
-moving stand and canopy inside, putting tank and sump in/on stand
-plumbing tank system (yay!!!) - I plan on painting PVC with black krylon fusion paint to make it look stealthy ;)
-bolt stand to the wall to prevent it tipping - the stand is tall and will be in a high traffic area so I'm taking extra precautions
-attach intarsia to stand door via wood glue (this will be one of the last things that I do...if the intarsia gets damaged I'll cry)
Here's what I've done today:
-2nd coat of polyurethane is done
-hardware replaced
-reflector and lighting installed inside canopy - "sealed" connection points on lights with silicon, waiting for that to dry
-stand and canopy are in the house, though canopy went back out in the garage because silicon smells bad
-plumbing is mostly done - I cut/fit/glued everything that I could, painted the top half of the return and the drain black, waiting on the paint to dry before I can glue top and bottom portions of the plumbing together
-intarsia is glued on...yay!
Here's what's left to do today:
-put door back on stand (removed so that intarsia could dry flat instead of vertically)
-glue top and bottom portions of plumbing together (have to wait till paint is dry)
-bolt stand to wall
-add sand to display tank (using dry sand that will be seeded with live stuff)
Tomorrow:
-put canopy on display tank once silicon is dry
-do 15 gallons worth of WC's on the cube and put that water in the new system :bounce1:
-tinker with ball valve so that I don't have too much flow
-aquascape
-program timers for fuge, blue, and white lights
-take lots of pics!!!
I'm excited that this is finally coming together...can you tell? :)