- Joined
- Apr 16, 2017
- Messages
- 415
- Reaction score
- 174
Here it goes after much thinking and frustration I started the build! To start my floors are steel with concrete pads! So the floor was so unlovely. Leveling it was a disaster. I got hen got a 3/4” price of plywood and shimmed between the stand and plywood. Time to fill her up!
. I then began adding Oatey Bath tub liner to help prevent major spills onto the carpet
Me and my mom designed some doors I carved she painted them.
Here is where I will house my equipment
I have one concern though... the stand was built with a oval that stretches almost the whole back side to install the bulkheads. Should I worry about the center brace not being supported in this section
Me and my mom designed some doors I carved she painted them.
Here is where I will house my equipment
I have one concern though... the stand was built with a oval that stretches almost the whole back side to install the bulkheads. Should I worry about the center brace not being supported in this section