Getting my tank this week and have to decide.... i have 4 holes drilled, do I go bean animal and one return or herbie and two returns?
Tank is 5x2x2 (150g). My plan was to run one return line straight to the tank and use a second return to go through a manifold and UV (also gives me redundancy in the pumps). I can tie the second line back into the main line after the UV but something I saw in the past was against two pumps feeding into the same return line. I could also just run the manifold and UV with the return on one pump but I can't run the flow slow enough for proper ICH management.
Which would you prioritize, 2 pumps/returns or 3 drains?
Tank is 5x2x2 (150g). My plan was to run one return line straight to the tank and use a second return to go through a manifold and UV (also gives me redundancy in the pumps). I can tie the second line back into the main line after the UV but something I saw in the past was against two pumps feeding into the same return line. I could also just run the manifold and UV with the return on one pump but I can't run the flow slow enough for proper ICH management.
Which would you prioritize, 2 pumps/returns or 3 drains?
