Fixed the seep with weld on 4 and lined inside with a strip. Got plumbing behind tank finished floor pan in. Drilled the sumps for equalization pipe. Just need to frame rest in for the skin. Then seal the bottom with silicone tomorrow.
Place right end on and back plate. Then move to place and fill to test. Maybe by wednesday. We leave to go out of town thursday. Wish i had it up before but i can enjoy it after. Going to take my time in setting formations with lots of caves for all thr carnivores and deep sand area for wrasse to sleep.
Place right end on and back plate. Then move to place and fill to test. Maybe by wednesday. We leave to go out of town thursday. Wish i had it up before but i can enjoy it after. Going to take my time in setting formations with lots of caves for all thr carnivores and deep sand area for wrasse to sleep.