Breakout Box wire run length?

  • Thread starter Thread starter Tac302000
  • Start date Start date
  • Tagged users Tagged users None

Tac302000

New Member
View Badges
Joined
Jul 19, 2020
Messages
18
Reaction score
4
Location
Tacoma
What state or country do you live in
Washington
Rating - 0%
0   0   0
Hello!

My build is coming towards the end finally. My Apex will be located in my basement fishroom. I will have a second Energy Bar 832 under my display cabinet for lighting and Tunze pumps connected to the Apex in the basement via Aquabus. I also want to have an emergency shut-off button, feed mode button and a cabinet lighting switch under my display all controlled by Apex via a Breakout Box. In my fishroom, I want another emergency shut-off and a maintenance mode button. What is the best way to accomplish this with only the one Breakout Box? Can I run the wiring for my buttons and switches from the basement to my display (it would be about 40')? Or, is there a better way to accomplish this?

Thanks in advance!

-Scott
 
It should not be any problem to run long wires to the breakout box. You can also easily test this in advance by simply connecting the switches to the breakout box with long wires prior to actually running the wires through the floor.
 

WHAT MOST MAKES A BLACK FRIDAY REEF DEAL WORTH CONSIDERING?

  • A real discount on something already on my list

    Votes: 53 75.7%
  • Free or reduced shipping

    Votes: 13 18.6%
  • A useful bundle of gear or supplies

    Votes: 3 4.3%
  • A good price on livestock I’ve already researched

    Votes: 16 22.9%
  • A rare chance to get something hard to find

    Votes: 15 21.4%
  • A seller or brand I trust

    Votes: 14 20.0%
  • I buy when I need something, sale or not

    Votes: 13 18.6%
  • Other (Post in the comments)

    Votes: 2 2.9%
Back
Top
Home
Post thread…
Market
What's new