- Joined
- Oct 25, 2021
- Messages
- 35
- Reaction score
- 55
- Location
- New Zealand
- What state or country do you live in
- Other International
Anyone with acrylic knowledge? I’m thinking about drilling another hole for the return (the drains are a 2 in 1 set up.) The holes will be 100mm (4”) ₵ apart, or 170mm (6.6”) far edge to far edge. The overflow is just a slide over box, won’t be bonded to the base so no added structural bracing.
Otherwise I just go back to running it externally in the wall. Fresh water top off RODI tubing will need to be run external anyway so no biggie.
Basically, after opinions on structural integrity; 5/6 or 15mm base. Holes centred 100mm or 4” apart. One 50mm or 2” hole, the other a 25mm or 1” return. Don’t want any flexion or crack forming between hole A and B.
Cylinder is 850mm or 34” round, by 675mm or 27”? Tall.
Cheers, B.

Otherwise I just go back to running it externally in the wall. Fresh water top off RODI tubing will need to be run external anyway so no biggie.
Basically, after opinions on structural integrity; 5/6 or 15mm base. Holes centred 100mm or 4” apart. One 50mm or 2” hole, the other a 25mm or 1” return. Don’t want any flexion or crack forming between hole A and B.
Cylinder is 850mm or 34” round, by 675mm or 27”? Tall.
Cheers, B.


