Electronic Experts Quick question(s).

chaostactics

Valuable Member
View Badges
Joined
Jul 5, 2010
Messages
1,155
Reaction score
677
Location
Maryland
Rating - 0%
0   0   0
I used a delay on break timer years ago to make a very effective feed delay timer for a return pump. That time I used a cut extension cord between a switch panel and the pump and (used a momentary button switch as the power interruption)
as my wire in point for the delay on break timer.

This time I am planning on putting it inside of the switch panel. I don't really anticipate needing to change the delay on time but can just open the panel if I need to adjust it later.

My plan is to just switch off then back on the switch that the delay on break timer is wired into to create the delay that triggers the timer count down.

My 2 questions: 1. A flip on and off should trigger the break timer.
2. National wiring code brown should be hot. Wiring the break timer in place of a brown jumper is the appropriate place add the interruption yes?


Thank you.
IMG_20201017_094322.jpg
 

Phycodurus

Well-Known Member
View Badges
Joined
May 18, 2018
Messages
905
Reaction score
1,690
Location
Los Angeles
Rating - 0%
0   0   0
bump


(i’m not qualified to answer ... the extent of my electrical knowledge is knowing not to stick a fork or a knife in an outlet). ;Dead
 

theatrus

Valuable Member
View Badges
Joined
Mar 26, 2016
Messages
2,253
Reaction score
3,603
Location
Sacramento, CA area
Rating - 0%
0   0   0
Brown doesn't mean much - its likely to be the switched hot conductor, but just check where it lands on the outlets.

I'm not familiar with the delay timers - I expect it will work just fine as you described.
 

MrSalty

Community Member
View Badges
Joined
Aug 13, 2020
Messages
39
Reaction score
12
Location
SW
Rating - 0%
0   0   0
Your answer to the first question is yes. I've seen delay timers commonly used in HVAC, this is a novel use for one but, quite clever. To answer the second question since this is AC hot or neutral can be switched. The important part it to make sure the "load" is connected to the correct side of the delay timer or it will not operate correctly.
 
Last edited:

TOP 10 Trending Threads

DO YOU THINK TECHNOLOGICAL ADVANCEMENTS ARE MORE HELPFUL OR HURTFUL TO REEFING?

  • More helpful.

    Votes: 49 41.5%
  • More hurtful.

    Votes: 5 4.2%
  • I think it depends mostly on the technology.

    Votes: 47 39.8%
  • I think it dependsmostly on the reefer behind the technology.

    Votes: 35 29.7%
Back
Top
Home
Post thread…
Market
What's new