Feel like I'm forgetting something. Any feedback?
From left to right, top to bottom, WXM, FMM, FMM, ASM, 2016; VarioS return, VarioS Skimmer, BoB, then DOSs and EBs.
I'm planing to router out cable holes with rounded edges in all the circled places. There will be a cabinet over the EB832s right below the DOSs. I plan pass throughs right above the EB832s to route the power cords out. Cut outs next to EBs are for 1Link and DC24.
I don't have the ASM yet, but I want to finish this nicely, so it'll all be pre-drilled and waiting. Just looking for any obvious stuff I'm missing.
I might need a 1LINK module in the future so I'm leaving some space. 2x WAV, 1x COR, 2xDOS, 1x Trident doesn't leave me with any more. Or a a Vectra controller if the COR doesn't work.
This panel will be finished to match and installed in the back of my "chiller" compartment. The DDRs will sit in the front.
From left to right, top to bottom, WXM, FMM, FMM, ASM, 2016; VarioS return, VarioS Skimmer, BoB, then DOSs and EBs.
I'm planing to router out cable holes with rounded edges in all the circled places. There will be a cabinet over the EB832s right below the DOSs. I plan pass throughs right above the EB832s to route the power cords out. Cut outs next to EBs are for 1Link and DC24.
I don't have the ASM yet, but I want to finish this nicely, so it'll all be pre-drilled and waiting. Just looking for any obvious stuff I'm missing.
I might need a 1LINK module in the future so I'm leaving some space. 2x WAV, 1x COR, 2xDOS, 1x Trident doesn't leave me with any more. Or a a Vectra controller if the COR doesn't work.
This panel will be finished to match and installed in the back of my "chiller" compartment. The DDRs will sit in the front.