I have a new custom build system in the making as we speak. 110 gallons main display, bean animal, with a 50 gallons sump. It will be installed by the company building it.
I’ve never had a sump so I feel nervous about having to leave a few days for the holidays. I have researched and read that it takes time to adjust flow to reach stability. Lots of tweaking is sometimes required. I’ll be hundreds of miles away so an emergency would mean disaster.
I had planned to have everything set-up for next week, but it looks like it’s going to be delayed until at least the end of the month. That will leave me about 3 weeks, maybe less, to get familiar with the system and have it running smoothly.
Is that enough time for someone with no experience ? Should I ask to delay the installation after the holidays ?
Thanks !
I’ve never had a sump so I feel nervous about having to leave a few days for the holidays. I have researched and read that it takes time to adjust flow to reach stability. Lots of tweaking is sometimes required. I’ll be hundreds of miles away so an emergency would mean disaster.
I had planned to have everything set-up for next week, but it looks like it’s going to be delayed until at least the end of the month. That will leave me about 3 weeks, maybe less, to get familiar with the system and have it running smoothly.
Is that enough time for someone with no experience ? Should I ask to delay the installation after the holidays ?
Thanks !