- Joined
- Sep 15, 2015
- Messages
- 7,234
- Reaction score
- 26,151
- Location
- Sumter, SC
- What state or country do you live in
- South Carolina
I’m drip acclimating an LTA right now.
I have it spot prepped. A cove with an overhang available, rock work on one side, sand on the other. 4” deep sand in the cove.
Question is do I clear out a spot for it to attach to the glass bottom?
I have it spot prepped. A cove with an overhang available, rock work on one side, sand on the other. 4” deep sand in the cove.
Question is do I clear out a spot for it to attach to the glass bottom?
Last edited:
