- Joined
- May 27, 2013
- Messages
- 2,002
- Reaction score
- 747
The plumbing, glue & putty for the aquascape, aluminum T-slot for my light mount, and one of my Hydra 52 HD arrived today.
I am currently in the process of plumbing the tank. The overflow has been completed:
I had to route my emergency overflow through the left side due to lack of space on the right side. It will just drain into the sump instead of directly at the filter sock.
I am currently in the process of plumbing the tank. The overflow has been completed:
I had to route my emergency overflow through the left side due to lack of space on the right side. It will just drain into the sump instead of directly at the filter sock.