Good luck with the plumbing! I’m sure it will be awesome once it’s done.Hey Najer and LRT how are things going today.....any plans?
I am having coffee now and then will work on plumbing more stuff into the system...If I get it done today then plan on making the wood cabinet doors and frame for the stand. The stand is made of fiberglass square tubing...not metal as it may look in the pictures.
The schedule 80 bulk heads came yesterday but I was only able to get slip on inside and thread on backside so I will have to go to Lowes and get threaded 1 1/2 and use tape and pipe seal cause I don't want to glue them incase I ever have to take them off...
I like schedule 80 for the tank connect cause the gasket is bigger and thicker then schedule 40...