- Joined
- Jul 25, 2011
- Messages
- 1,136
- Reaction score
- 789
- Location
- Winter Park, FL
- What state or country do you live in
- Florida
So I bought a bunch of schedule 80 pac for my new tank, everything has been drilled for schedule 40.. I never even thought about this when we did the specs. Can you use Schedule 80 piping with Schedule 40 bulkheads without there being an issue?
