There are numerous ways to do this, including simple steel screw Jack columns that go from the concrete slab to the ceiling of the ground floor, supporting second floor joists!So I did a little inspectigating and found that the two columns towards the front (where I want the tank) are not load bearing. The two columns behind it, have a steal beam along the length below. However, that’s in the middle of the floor, and that’s not an ideal place for the tank.
I’m going to have the contractor reinforce the floor below the front two columns and place the tank there. Also going to add electric on the ceiling and floor.
I feel like you might run into some extensive drain noise complications if you try to run two separate overflow boxes with two separate styles of drain plumbing!Each short end will have a low profile interior overflow that lines up with the columns. Bean animal on one end and Herbie or Durso on the other.
I’d keep the two boxes, with identical drain styles in each, or switch to one large box with one large set of (probably BeanAnimal) drains, and the return plumbing! (The return plumbing can be run along the top of the tank inside a light canopy to get it to discharge on the far end from the overflow with this configuration)