New build options

  • Thread starter Thread starter rayn
  • Start date Start date
  • Tagged users Tagged users None

rayn

Bluefin Believer
View Badges
Joined
Mar 25, 2014
Messages
3,355
Reaction score
2,383
Location
Illinois
Rating - 0%
0   0   0
This is my first post in quite a while. I have a build thread which I will update or start new as I go along. But before any build can start, I have questions as things have most likely changed and or improved since I last had a tank.

If you were to start from scratch, what would you do or do differently? My build will be a 240 gallon and it is basically getting a room built around it. So any outlets can be placed wherever. Water lines, where needed. So what would you want in a dedicated tank room?
 
I would give myself a massive area on at least 3 sides of the tank for maintenance (and definitely both long sides). I'd also set up a clear water change area
 
I would give myself a massive area on at least 3 sides of the tank for maintenance (and definitely both long sides). I'd also set up a clear water change area
Water change station. I had thought of that, but not dealing with the old water till you posted. This is part of a whole basement remodel, so there will be concrete cut out, meaning I could cut a little more and add a drain.
 
I would give myself a massive area on at least 3 sides of the tank for maintenance (and definitely both long sides). I'd also set up a clear water change area
Water change station. I had thought of that, but not dealing with the old water till you posted. This is part of a whole basement remodel, so there will be concrete cut out, meaning I could cut a little more and add a drain.
I get borderline enraged with envy when I think of people who have wide open poorly insulated concrete slab basements with an open grate drain. Literally a requirement if I ever move
 
I get borderline enraged with envy when I think of people who have wide open poorly insulated concrete slab basements with an open grate drain. Literally a requirement if I ever move
Currently there are two, but opposite end of the basement. Plus they back up ONLY when the tub is used, so they need some work. Adding a kitchenette and a bathroom, so drain work already needs done. What’s one more?
 
This will be a SLOW build as the basement comes together at the same time, but I did get the stand and tank on it. Needs cleaned again for sure, but it in place!



IMG_1612.jpeg

IMG_1613.jpeg
 

TOP 10 Trending Threads

WHICH AREA OF REEFKEEPING MOST NEEDS A GENUINE BREAKTHROUGH?

  • Lighting

    Votes: 3 4.2%
  • Pumps and water flow

    Votes: 2 2.8%
  • Water testing and monitoring

    Votes: 24 33.3%
  • Controllers, apps, and device compatibility

    Votes: 8 11.1%
  • Filtration and nutrient export

    Votes: 1 1.4%
  • Automatic feeding

    Votes: 7 9.7%
  • Leak prevention and tank safety

    Votes: 7 9.7%
  • Equipment reliability and repairability

    Votes: 15 20.8%
  • Other (leave a comment in the thread)

    Votes: 5 6.9%
Back
Top
Home
Post thread…
Market
What's new