simple but want to be sure. I have 2 powerheads I want them both to run for 1 min together them one off other still on for 8 min then switch on/off then I would like a rest period of 2 min if possible. Then repeat all over again. Is this possible? If not I don’t need the rest period.
Help with the coding would be great
I was thinking something like but it’s not really what I want and I don’t think it will repeat correctly since total min are different.
001:00/008:00/008:00
002:00/008:00/008:00
Help with the coding would be great
I was thinking something like but it’s not really what I want and I don’t think it will repeat correctly since total min are different.
001:00/008:00/008:00
002:00/008:00/008:00