Questions reguarding installing a herbie drain on a 90RR

  • Thread starter Thread starter Jstn
  • Start date Start date
  • Tagged users Tagged users None

Jstn

Well-Known Member
View Badges
Joined
Jan 16, 2013
Messages
809
Reaction score
585
Location
Minneapolis Mn
Rating - 0%
0   0   0
I recently purchased a 90 RR with 2 1"bulkhead holes on the bottom; I am looking to setup a herbie by using the included plumbing and wanted a quick critic of my planed setup. Use the 1" pipe as the main drain, 6" below the overflow with a strainer. For the emergency drain place it within 1/2 of the overflow no stainer using the included 1 1/2" pipe reduced to 1" near the bulkhead.


I plan on drilling the return in the back later, but for a herbie does anything stand out as potentially problematic?


herbie-overflow-diagram-gmacreef-v11.jpg



Thanks in advanced!
 

TOP 10 Trending Threads

WHEN BUYING EQUIPMENT YOUR REEF WILL DEPEND ON, WHAT MATTERS MOST TO YOU?

  • Long-term reports from other reefers

    Votes: 9 52.9%
  • My own past experience with the brand

    Votes: 2 11.8%
  • A simple design I can understand and maintain

    Votes: 2 11.8%
  • Warranty and responsive customer support

    Votes: 1 5.9%
  • Independent testing or detailed reviews

    Votes: 2 11.8%
  • Advice from an LFS or reefer I personally trust

    Votes: 0 0.0%
  • Being able to keep a spare or build in redundancy

    Votes: 1 5.9%
  • Something else? Tell us in the comments

    Votes: 0 0.0%
Back
Top
Home
Post thread…
Market
What's new