Hi all, I need your opinions on my new setup.
So as you can see in my very un sophisticated image below I have the main water which feeds my rodi system. After the DI resin it goes to my storage tank which has to valves one to fill up 50L and another if opened it fills to 100L. Right before these two valves I have a T joint where a pipe goes straight to my ATO reservoir. Now my concerns are:
1) Is this a good setup
2) Should I add a valve at the very bottom and have the pipe feeding the ATO always coming out from the reservoir tank? or am I good getting it directly from the RO? It would feed my ATO with pure gravity however and there is a bit of a rise at the end as it has to pass through the wall on the right..
Feel free to suggest any modifications to get this bullet proof and as much as possible
So as you can see in my very un sophisticated image below I have the main water which feeds my rodi system. After the DI resin it goes to my storage tank which has to valves one to fill up 50L and another if opened it fills to 100L. Right before these two valves I have a T joint where a pipe goes straight to my ATO reservoir. Now my concerns are:
1) Is this a good setup
2) Should I add a valve at the very bottom and have the pipe feeding the ATO always coming out from the reservoir tank? or am I good getting it directly from the RO? It would feed my ATO with pure gravity however and there is a bit of a rise at the end as it has to pass through the wall on the right..
Feel free to suggest any modifications to get this bullet proof and as much as possible