I got started on the 55 this weekend. Got the other furniture moved out of the way (mostly). Drilled the end. Installed the overflow and bulkheads.
Here's what it looked like starting out, and roughly where it will live.
Drilling the holes.
And the overflow mounted.
I have black ABS for the barebottom. The sump will be built in a 20H with a sloped ATS. I got almost all of my plumbing parts this weekend, and the valves should be in tomorrow.
I'm adding a 2x4 base around the bottom to jack it up a few inches.
I've got classes and a ton of homework so I basically have a few hours on Saturdays to work on it. This will be a loooong process.
Here's what it looked like starting out, and roughly where it will live.
Drilling the holes.
And the overflow mounted.
I have black ABS for the barebottom. The sump will be built in a 20H with a sloped ATS. I got almost all of my plumbing parts this weekend, and the valves should be in tomorrow.
I'm adding a 2x4 base around the bottom to jack it up a few inches.
I've got classes and a ton of homework so I basically have a few hours on Saturdays to work on it. This will be a loooong process.