I was able to get a little work done, mounting tabs and screw holes for the the light fixture as well as the splash guard retaining pieces. (black things in second pic, there are 2 of them, the one in the pic and one on the opposite side diagonally from it.)


There is still some modeling to do, mounting spots for the magnets that will hold the door closed, the mounting posts for the sump light, mini magnet cleaner, float switch holder, ATO tank, to name a few off the top of my head. I'm going to look at some of the stuff that can be considered done and then start printing soon. (like the overflow box.)


There is still some modeling to do, mounting spots for the magnets that will hold the door closed, the mounting posts for the sump light, mini magnet cleaner, float switch holder, ATO tank, to name a few off the top of my head. I'm going to look at some of the stuff that can be considered done and then start printing soon. (like the overflow box.)






