- Joined
- Oct 24, 2019
- Messages
- 194
- Reaction score
- 105
So I built a steel frame stand for my new 6x2x2 180 gallon tank. The stand is built out of 1-1/2”x3”x0.125” and supported by 5 1-1/2”x0.125 square tube legs. The material is A36 carbon steel and all joints are full penetration GTAW welded.
I started my initial leak test last night and onleaks but took off the front wood panel and noticed about 1/16” gap between the 3/4” plywood and top of stand in the center of my unsupported run.
I started my initial leak test last night and onleaks but took off the front wood panel and noticed about 1/16” gap between the 3/4” plywood and top of stand in the center of my unsupported run.