Apex programming

brode

Active Member
View Badges
Joined
Sep 3, 2021
Messages
110
Reaction score
117
Location
home
Rating - 0%
0   0   0
Try to set my cor20 to 50% when it comes back on after a power failure but unfortunately the code I keep writing gets rejected, can someone help?
 

vetteguy53081

Well known Member and monster tank lover
View Badges
Joined
Aug 11, 2013
Messages
92,474
Reaction score
204,624
Location
Wisconsin -
Rating - 100%
14   0   0

SuncrestReef

That Apex guy
View Badges
Joined
Jan 18, 2018
Messages
4,214
Reaction score
9,228
Location
Oregon
Rating - 0%
0   0   0
Please explain in a bit more detail what you're trying to accomplish:

Do you want the COR at 50% only after a power failure, and if so, for how long after the power is restored?
Do you have any backup power source while the power is off, such as a generator or UPS backup battery?
Once things are back to normal, what speed do you want the COR to run at?
What about Feed modes or other exceptions?
 

Making aqua concoctions: Have you ever tried the Reef Moonshiner Method?

  • I currently use the moonshiner method.

    Votes: 24 22.4%
  • I don’t currently use the moonshiner method, but I have in the past.

    Votes: 2 1.9%
  • I have not used the moonshiner method.

    Votes: 77 72.0%
  • Other.

    Votes: 4 3.7%
Back
Top