Hello all,
I just acquired a customer 180 that was designed for the Bean Animal draining system. However I didn't know what was and hated the pve pipe hanging over the back and going back into the tank as the return.
So I started plumbing for a herbie and glue my return line when I realized that the tank wasn't designed for this.
Any suggestions on what I can do to to avoid cutting all of this pvc and starting over?
Thanks in advance