So, I'm getting my hands on a Trigger Systems sump, and am trying to figure out how to make this work.
On my system, I have 3 1" bulkheads, with 1.5" PVC down. The sump has 1" bulkheads. I'm left with 2 choices.
1. Keep my existing PVC drain pipes, and add a 1.5" to 1" reducer into the bulkhead of the sump. Now, I can essentially make that final run at 1" PVC...or should I get it reduced to 1" PVC as early as possible?
If I do the reducer will the system still work, as quiet as it is? Will the siphon have any problems starting?
2. Redo all my drain pipes to 1" PVC?
On my system, I have 3 1" bulkheads, with 1.5" PVC down. The sump has 1" bulkheads. I'm left with 2 choices.
1. Keep my existing PVC drain pipes, and add a 1.5" to 1" reducer into the bulkhead of the sump. Now, I can essentially make that final run at 1" PVC...or should I get it reduced to 1" PVC as early as possible?
If I do the reducer will the system still work, as quiet as it is? Will the siphon have any problems starting?
2. Redo all my drain pipes to 1" PVC?